Company Information


Syarikat Sesco Berhad
Location : Sarawak
Projects
1. Miri Airport 33/11kv Substation - 11kv Switchgear Extension Works (< 1 million)
2. Marina 33/11kv Substation Miri - 11kv Switchgear Extension (< 1 million)
3. Underground Pipes Crossing @ Miri And Bintulu - Horizontal Directional Drilling (hdd) (Between 1 and 10 million)
4. Miri Airport, Luak Bay And Lambir 33/11kv Substation - 33kv Switchgear Extension Works (Between 10 and 50 million)
5. Limbang Power Station - Cctv Installation (Between 1 and 10 million)
6. New Outdoor Substation @ Miri - Civil Works (< 1 million)
7. Tudan 275kv Substation To Permyjaya 33kv Substation - 33kv Cable Laying, Jointing And Horizontal Directional Drilling (Between 1 and 10 million)
8. Luak 33kv Sub To Airport 33kv Sub - Horizontal Directional Drilling (hdd) Works (Between 1 and 10 million)
9. Training Ground @ Miri - Stores Construction Works (Undisclosed)
10. Lambir 33kv Sub To Marudi Junction 275/33kv Sub - 33kv Cable Laying And Jointing Works (Between 1 and 10 million)

Project Request


Search Company