Overview: UNIVERSITI MALAYSIA TERENGGANU - REPLACEMENT OF AIR CONDITIONING SYSTEM (PHASE 5) is a government Air-conditioning System construction project in Terengganu. The scope is recorded as New Construction. UNIVERSITI MALAYSIA TERENGGANU is currently recorded at Construction - Site Works, with external and finishing works in progress. The main contractor has been awarded. Construction started Sep 2023. The project value is recorded in the Less than 1 million range. myBina has identified 2 companies across 2 roles on UNIVERSITI MALAYSIA TERENGGANU: 1 developer and 1 contractor. This record was last verified on 8 September 2023 (Issue 202309.3).
| Project ID | : | 90784 |
| Issue Number | : | 202309.3 |
| Project Status | : | Construction - Site Works |
| Job Award Status | : | Main contractor awarded |
| State | : | Terengganu |
| Category | : | Air-conditioning System |
| Full Address | : | |
| Construction Start | : | Sep 2023 |
| Target Completion | : | — |
| Project Ownership | : | Government |
| Project Works | : | New Construction |
| Value Range | : | Less than 1 million |
| Project Value | : | |
| Contractor Spec | : | |
| Tender Deadline | : |
Full project details are on record for UNIVERSITI MALAYSIA TERENGGANU - REPLACEMENT OF AIR CONDITIONING SYSTEM (PHASE 5), covering the scope of works, site arrangement and contract structure. Available to myBina subscribers.
Recorded specifications for this project cover structural, M&E and finishes requirements, alongside contractor grade and tender details. Available to myBina subscribers.
myBina has identified 2 companies across 2 roles on UNIVERSITI MALAYSIA TERENGGANU - REPLACEMENT OF AIR CONDITIONING SYSTEM (PHASE 5): 1 developer and 1 contractor.
Contact us to reveal company names, phone numbers, emails and full contact details.
Other Air-conditioning System construction projects recorded by myBina in Terengganu:
- LECTURER COMPLEX, LABORATORY AND MARITIME BUILDING @ UMT - AIR CONDITIONING SYSTEM
- TENAGA NASIONAL BERHAD - MAIN DISTRIBUTION SUBSTATION (PPU) BUILDING @ KUALA DUNGUN
- UNIVERSITI MALAYSIA TERENGGANU - AIR CONDITIONING SYSTEM (PHASE 6)
- UNIVERSITI MALAYSIA TERENGGANU - AIR CONDITIONING SYSTEM (PACKAGE B)
- WISMA MAIDAM, JALAN BANGGOL, KUALA TERENGGANU - AIR CONDITIONING SYSTEM
Need access to all 10,000+ projects?
A myBina membership gives you unlimited access across all states, categories and project statuses — with alerts, CRM tools and export features.
Contact Us