Overview: KAMPUNG RANCHAK/JALAN MUHIBAH, SARIKEI - NEW BRIDGE is a government New Bridge construction project in Sarawak. The scope is recorded as New Construction. KAMPUNG RANCHAK/JALAN MUHIBAH, SARIKEI is currently recorded at Mobilization. The main contractor has been awarded. Construction started May 2026. The project value is recorded in the Between 10 and 50 million range. myBina has identified 3 companies across 3 roles on KAMPUNG RANCHAK/JALAN MUHIBAH, SARIKEI: 1 developer, 1 consultant and 1 contractor. This record was last verified on 15 April 2026 (Issue 202608.1).
| Project ID | : | 102987 |
| Issue Number | : | 202608.1 |
| Project Status | : | Mobilization |
| Job Award Status | : | Main contractor awarded |
| State | : | Sarawak |
| Category | : | New Bridge |
| Full Address | : | |
| Construction Start | : | May 2026 |
| Target Completion | : | — |
| Project Ownership | : | Government |
| Project Works | : | New Construction |
| Value Range | : | Between 10 and 50 million |
| Project Value | : | |
| Contractor Spec | : | |
| Tender Deadline | : |
Full project details are on record for KAMPUNG RANCHAK/JALAN MUHIBAH, SARIKEI - NEW BRIDGE, covering the scope of works, site arrangement and contract structure. Available to myBina subscribers.
Recorded specifications for this project cover structural, M&E and finishes requirements, alongside contractor grade and tender details. Available to myBina subscribers.
myBina has identified 3 companies across 3 roles on KAMPUNG RANCHAK/JALAN MUHIBAH, SARIKEI - NEW BRIDGE: 1 developer, 1 consultant and 1 contractor.
Contact us to reveal company names, phone numbers, emails and full contact details.
Other New Bridge construction projects recorded by myBina in Sarawak:
- BUKIT GORAM/ KATIBAS/ NGEMAH/ MACHAN : NEW ROAD (PACKAGE 1)
- BAHAGIAN MIRI AND LIMBANG, SARAWAK (PACKAGE 2) - BEACH EROSION CONTROL WORKS (DESIGN AND BUILD)
- BAHAGIAN MUKAH, SARAWAK (PACKAGE 4) - BEACH EROSION CONTROL WORKS (DESIGN AND BUILD)
- BAHAGIAN BETONG, SARAWAK (PACKAGE 3) - BEACH EROSION CONTROL WORKS (DESIGN AND BUILD)
- KUCHING AND SAMARAHAN, SARAWAK (PACKAGE 1) - BEACH EROSION CONTROL WORKS (DESIGN AND BUILD)
Need access to all 10,000+ projects?
A myBina membership gives you unlimited access across all states, categories and project statuses — with alerts, CRM tools and export features.
Contact Us