Home / Pulau Pinang / Flood Detention Pond
#104270
PERBADANAN PEMBANGUNAN PULAU PINANG - RETENTION POND, PUMP HOUSE AND SUCTION TANK (DESIGN AND BUILD)
Preview

Overview: PERBADANAN PEMBANGUNAN PULAU PINANG - RETENTION POND, PUMP HOUSE AND SUCTION TANK (DESIGN AND BUILD) is a government Flood Detention Pond construction project in Pulau Pinang. The scope is recorded as New Construction. PERBADANAN PEMBANGUNAN PULAU PINANG is currently recorded at Prequalification of Contractor / Tendered, which is still at tender stage. The project value is recorded in the Between 10 and 50 million range. myBina has identified 6 companies across 6 roles on PERBADANAN PEMBANGUNAN PULAU PINANG: 1 developer, 1 civil / structural engineer, 1 mech. / electrical engineer, 1 architect / planner and 2 other roles. This record was last verified on 15 September 2026 (Issue 202701.1).

State
Pulau Pinang
Status
Prequalification of Contractor / Tendered
Ownership
Government
Value Range
Between 10 and 50 million
Project Information  Preview
Project ID:104270
Issue Number:202701.1
Project Status: Prequalification of Contractor / Tendered
State:Pulau Pinang
Category:Flood Detention Pond
Full Address:
Construction Start:
Target Completion:
Project Ownership:Government
Project Works:New Construction
Value Range:Between 10 and 50 million
Project Value:
Contractor Spec:
Tender Deadline:
Project Summary
Retention pond, pump houses, suction tanks
Project Details  Locked

Full project details are on record for PERBADANAN PEMBANGUNAN PULAU PINANG - RETENTION POND, PUMP HOUSE AND SUCTION TANK (DESIGN AND BUILD), covering the scope of works, site arrangement and contract structure. Available to myBina subscribers.

Specifications  Locked

Recorded specifications for this project cover structural, M&E and finishes requirements, alongside contractor grade and tender details. Available to myBina subscribers.

Companies Identified 6 companies · 6 roles

myBina has identified 6 companies across 6 roles on PERBADANAN PEMBANGUNAN PULAU PINANG - RETENTION POND, PUMP HOUSE AND SUCTION TANK (DESIGN AND BUILD): 1 developer, 1 civil / structural engineer, 1 mech. / electrical engineer, 1 architect / planner and 2 other roles.

Developer
1 co.
1 company identified, name and contact available to subscribers.
Civil / Structural Engineer
1 co.
1 company identified, name and contact available to subscribers.
Mech. / Electrical Engineer
1 co.
1 company identified, name and contact available to subscribers.
Architect / Planner
1 co.
1 company identified, name and contact available to subscribers.
EIA Consultant
1 co.
1 company identified, name and contact available to subscribers.
Contractor
1 co.
1 company identified, name and contact available to subscribers.

 Contact us to reveal company names, phone numbers, emails and full contact details.

Similar Projects Flood Detention Pond · Pulau Pinang

Other Flood Detention Pond construction projects recorded by myBina in Pulau Pinang:

Need access to all 10,000+ projects?

A myBina membership gives you unlimited access across all states, categories and project statuses — with alerts, CRM tools and export features.

Contact Us