Overview: HOSPITAL TENGKU AMPUAN AFZAN - WATER PIPING SYSTEM (REPLACEMENT WORKS) is a government Water Pipes construction project in Pahang. HOSPITAL TENGKU AMPUAN AFZAN is currently recorded at Construction - Structural, with superstructure works in progress. The main contractor has been awarded. The project value is recorded in the Between 1 and 10 million range. myBina has identified 3 companies across 3 roles on HOSPITAL TENGKU AMPUAN AFZAN: 1 developer, 1 consultant and 1 subcon piping / drainage / sanitary fitting. This record was last verified on 12 October 2016 (Issue 201610.3).
| Project ID | : | 55633 |
| Issue Number | : | 201610.3 |
| Project Status | : | Construction - Structural |
| Job Award Status | : | Main contractor awarded |
| State | : | Pahang |
| Category | : | Water Pipes |
| Full Address | : | |
| Construction Start | : | — |
| Target Completion | : | — |
| Project Ownership | : | Government |
| Value Range | : | Between 1 and 10 million |
| Project Value | : | |
| Contractor Spec | : | |
| Tender Deadline | : |
Full project details are on record for HOSPITAL TENGKU AMPUAN AFZAN - WATER PIPING SYSTEM (REPLACEMENT WORKS), covering the scope of works, site arrangement and contract structure. Available to myBina subscribers.
Recorded specifications for this project cover structural, M&E and finishes requirements, alongside contractor grade and tender details. Available to myBina subscribers.
myBina has identified 3 companies across 3 roles on HOSPITAL TENGKU AMPUAN AFZAN - WATER PIPING SYSTEM (REPLACEMENT WORKS): 1 developer, 1 consultant and 1 subcon piping / drainage / sanitary fitting.
Contact us to reveal company names, phone numbers, emails and full contact details.
Other Water Pipes construction projects recorded by myBina in Pahang:
- GENTING MALAYSIA BERHAD - UPGRADING WATER STORAGE CAPACITY @ SUNGAI CHEROK DAM
- PMU JERANTUT TO MINI PPU DAMAK - 33kV AERIAL BUNDLE CABLE (ABC) WORKS
- PMU JAMBU RIAS TO PPU PULKA - 33kV (3 x 150mm2) AERIAL BUNDLE CABLE (ABC) WORKS
- POINT Z TO POINT M (BORDER PAHANG/SELANGOR) - 500kV AND 275KV DOUBLE CIRCUIT TRANSMISSION LINES
- MUKIM ULU LEPAR - HORIZONTAL DIRECTIONAL DRILLING (HDD) WORKS
Need access to all 10,000+ projects?
A myBina membership gives you unlimited access across all states, categories and project statuses — with alerts, CRM tools and export features.
Contact Us