Overview: RENEWABLE ELECTRICAL ENERGY POWER PLANT @ TAIPING is a Power Plant construction project in Perak. The scope is recorded as New Construction. RENEWABLE ELECTRICAL ENERGY POWER PLANT is currently recorded at Document - Approval & Lobbying, which is still in pre-construction. The main contractor has been awarded. The project value is recorded in the Undisclosed range. myBina has identified 4 companies across 3 roles on RENEWABLE ELECTRICAL ENERGY POWER PLANT: 2 developers, 1 consultant and 1 contractor. This record was last verified on 15 November 2016 (Issue 201611.3).
| Project ID | : | 56183 |
| Issue Number | : | 201611.3 |
| Project Status | : | Document - Approval & Lobbying |
| Job Award Status | : | Main contractor awarded |
| State | : | Perak |
| Category | : | Power Plant |
| Full Address | : | |
| Construction Start | : | — |
| Target Completion | : | — |
| Project Ownership | : | Private |
| Project Works | : | New Construction |
| Value Range | : | Undisclosed |
| Project Value | : | |
| Contractor Spec | : | |
| Tender Deadline | : |
Full project details are on record for RENEWABLE ELECTRICAL ENERGY POWER PLANT @ TAIPING, covering the scope of works, site arrangement and contract structure. Available to myBina subscribers.
Recorded specifications for this project cover structural, M&E and finishes requirements, alongside contractor grade and tender details. Available to myBina subscribers.
myBina has identified 4 companies across 3 roles on RENEWABLE ELECTRICAL ENERGY POWER PLANT @ TAIPING: 2 developers, 1 consultant and 1 contractor.
Contact us to reveal company names, phone numbers, emails and full contact details.
Other Power Plant construction projects recorded by myBina in Perak:
- STADIUM PERAK - SCOREBOARD
- MINI PPU BAWONG - 33KV DISTRIBUTION SYSTEM (PHASE 2)
- LEKIR BULK TERMINAL @ SERI MANJUNG - BERTH CONVEYOR NO. 1 & 2
- PERAK DARUL RIDZUAN BUILDING - MAINTENANCE OF MECHANICAL AND ELECTRICAL SYSTEM
- BATU GAJAH KTMB COMPLEX - OPERATION & MAINTENANCE OF SEWERAGE TREATMENT PLANT (24 MONTHS)