Overview: INSTITUT TANAH DAN UKUR NEGARA (INSTUN), PERAK - RETROFITTED GRID CONNECTED SOLAR PHOTOVOLTAIC SYSTEM (GCPV) is a government Solar Photovoltaic System construction project in Perak. The scope is recorded as New Construction. INSTITUT TANAH DAN UKUR NEGARA is currently recorded at Completed, with works approaching completion. The main contractor has been awarded. Construction started Dec 2018, with target completion Apr 2019. The project value is recorded in the Between 1 and 10 million range. myBina has identified 2 companies across 2 roles on INSTITUT TANAH DAN UKUR NEGARA: 1 developer and 1 contractor. This record was last verified on 15 November 2019 (Issue 201911.3).
| Project ID | : | 65016 |
| Issue Number | : | 201911.3 |
| Project Status | : | Completed |
| Job Award Status | : | Main contractor awarded |
| State | : | Perak |
| Category | : | Solar Photovoltaic System |
| Full Address | : | |
| Construction Start | : | Dec 2018 |
| Target Completion | : | Apr 2019 |
| Project Ownership | : | Government |
| Project Works | : | New Construction |
| Value Range | : | Between 1 and 10 million |
| Project Value | : | |
| Contractor Spec | : | |
| Tender Deadline | : |
Full project details are on record for INSTITUT TANAH DAN UKUR NEGARA (INSTUN), PERAK - RETROFITTED GRID CONNECTED SOLAR PHOTOVOLTAIC SYSTEM (GCPV), covering the scope of works, site arrangement and contract structure. Available to myBina subscribers.
Recorded specifications for this project cover structural, M&E and finishes requirements, alongside contractor grade and tender details. Available to myBina subscribers.
myBina has identified 2 companies across 2 roles on INSTITUT TANAH DAN UKUR NEGARA (INSTUN), PERAK - RETROFITTED GRID CONNECTED SOLAR PHOTOVOLTAIC SYSTEM (GCPV): 1 developer and 1 contractor.
Contact us to reveal company names, phone numbers, emails and full contact details.
Other Solar Photovoltaic System construction projects recorded by myBina in Perak:
- PERAK DISTRIBUTION DIVISION : MAINTENANCE OF 33KV CABLE AND FIBER OPTICS CABLE
- ASSAM KUMBANG @ TAIPING - SEWAGE TREATMENT PLANT AND SEWAGE PIPE NETWORKS (DESIGN & BUILD)
- PMU 500/275KV AYER TAWAR EXTENSION
- (PPU) 33/11KV NORTH ZONE (PACKAGE 2) - MAIN DISTRIBUTION SUBSTATION (DESIGN AND BUILD)
- LALUAN TO TAMAN PERMAI JAYA @ BIDOR - PIPE INSTALLATION WORKS (PACKAGE 1)
Need access to all 10,000+ projects?
A myBina membership gives you unlimited access across all states, categories and project statuses — with alerts, CRM tools and export features.
Contact Us