Overview: PMU PORT DICKSON POWER STATION - 275Kv CIRCUIT BREAKER REPLACEMENT WORKS is a Circuit Breaker construction project in Negeri Sembilan. The scope is recorded as Extension / Additional Building. PMU PORT DICKSON POWER STATION is currently recorded at Tender / Evaluation, which is still at tender stage. The project value is recorded in the Between 1 and 10 million range. myBina has identified 3 companies across 3 roles on PMU PORT DICKSON POWER STATION: 1 developer, 1 consultant and 1 contractor. This record was last verified on 26 November 2018 (Issue 201811.3).
| Project ID | : | 68851 |
| Issue Number | : | 201811.3 |
| Project Status | : | Tender / Evaluation |
| State | : | Negeri Sembilan |
| Category | : | Circuit Breaker |
| Full Address | : | |
| Construction Start | : | — |
| Target Completion | : | — |
| Project Ownership | : | Private |
| Project Works | : | Extension / Additional Building |
| Value Range | : | Between 1 and 10 million |
| Project Value | : | |
| Contractor Spec | : | |
| Tender Deadline | : |
Full project details are on record for PMU PORT DICKSON POWER STATION - 275Kv CIRCUIT BREAKER REPLACEMENT WORKS, covering the scope of works, site arrangement and contract structure. Available to myBina subscribers.
Recorded specifications for this project cover structural, M&E and finishes requirements, alongside contractor grade and tender details. Available to myBina subscribers.
myBina has identified 3 companies across 3 roles on PMU PORT DICKSON POWER STATION - 275Kv CIRCUIT BREAKER REPLACEMENT WORKS: 1 developer, 1 consultant and 1 contractor.
Contact us to reveal company names, phone numbers, emails and full contact details.
Other Circuit Breaker construction projects recorded by myBina in Negeri Sembilan:
- NEGERI SEMBILAN - RURAL WATER SUPPLY (BALB) (YEARS 2015)
- FELDA JELAI 1 TO FELDA JELAI 2 , MUKIM GEMAS - PIPING WORKS
- TAMAN PENGELUARAN PRODUK USAHAWAN (TPPU) PEDAS - ELECTRICAL UPGRADING WORKS
- UNIVERSITI SAINS ISLAM MALAYSIA, NILAI : MAINTENANCE OF AIR CONDITIONING SYSTEM (36 MONTH)
- INTAKE GRAVITY TO ULU BENDUL WATER TREATMENT PLANT @ KUALA PILAH - PIPING WORKS
Need access to all 10,000+ projects?
A myBina membership gives you unlimited access across all states, categories and project statuses — with alerts, CRM tools and export features.
Contact Us