Overview: INDAH WATER KONSORTIUM SDN BHD @ EASTERN REGION : SEWAGE TREATMENT PLANT (STP) UPGRADING AND MODIFICATION is a government Sewerage Treatment Plant construction project in Kelantan, Pahang, Terengganu. The scope is recorded as New Construction. INDAH WATER KONSORTIUM SDN BHD is currently recorded at Prequalification of Contractor / Tendered, which is still at tender stage. The project value is recorded in the Between 1 and 10 million range. myBina has identified 3 companies across 3 roles on INDAH WATER KONSORTIUM SDN BHD: 1 developer, 1 consultant and 1 contractor. This record was last verified on 14 November 2019 (Issue 201911.3).
| Project ID | : | 74214 |
| Issue Number | : | 201911.3 |
| Project Status | : | Prequalification of Contractor / Tendered |
| State | : | Kelantan, Pahang, Terengganu |
| Category | : | Sewerage Treatment Plant |
| Full Address | : | |
| Construction Start | : | — |
| Target Completion | : | — |
| Project Ownership | : | Government |
| Project Works | : | New Construction |
| Value Range | : | Between 1 and 10 million |
| Project Value | : | |
| Contractor Spec | : | |
| Tender Deadline | : |
Full project details are on record for INDAH WATER KONSORTIUM SDN BHD @ EASTERN REGION : SEWAGE TREATMENT PLANT (STP) UPGRADING AND MODIFICATION, covering the scope of works, site arrangement and contract structure. Available to myBina subscribers.
Recorded specifications for this project cover structural, M&E and finishes requirements, alongside contractor grade and tender details. Available to myBina subscribers.
myBina has identified 3 companies across 3 roles on INDAH WATER KONSORTIUM SDN BHD @ EASTERN REGION : SEWAGE TREATMENT PLANT (STP) UPGRADING AND MODIFICATION: 1 developer, 1 consultant and 1 contractor.
Contact us to reveal company names, phone numbers, emails and full contact details.
Other Sewerage Treatment Plant construction projects recorded by myBina in Kelantan:
- (PPU) 33/11KV EAST ZONE (PACKAGE 1) @ MACHANG - MAIN DISTRIBUTION SUBSTATION (DESIGN AND BUILD)
- (PPU) 33/11KV EAST ZONE (PACKAGE 1) @ HOSPITAL KOTA BHARU - MAIN DISTRIBUTION SUBSTATION (DESIGN AND BUILD)
- (PPU) 33/11KV KOK SERAYA - MAIN DISTRIBUTION SUBSTATION (DESIGN AND BUILD)
- (PPU) 33/11KV KOTA BHARU SENTRAL - MAIN DISTRIBUTION SUBSTATION (DESIGN AND BUILD)
- UNIVERSITI TEKNOLOGI MARA (UiTM) KELANTAN, MACHANG CAMPUS - WATER SUPPLY SYSTEM
Need access to all 10,000+ projects?
A myBina membership gives you unlimited access across all states, categories and project statuses — with alerts, CRM tools and export features.
Contact Us