Overview: MIRI TRANSPORTATION OF WATER (FROM NIAH SUBIS WATER TREATMENT PLANT) is a government Water Supply construction project in Sarawak. The scope is recorded as New Construction. MIRI TRANSPORTATION OF WATER is currently recorded at Prequalification of Contractor / Tendered, which is still at tender stage. The project value is recorded in the Between 10 and 50 million range. myBina has identified 3 companies across 2 roles on MIRI TRANSPORTATION OF WATER: 2 developers and 1 contractor. This record was last verified on 29 May 2020 (Issue 202005.3).
| Project ID | : | 76954 |
| Issue Number | : | 202005.3 |
| Project Status | : | Prequalification of Contractor / Tendered |
| State | : | Sarawak |
| Category | : | Water Supply |
| Full Address | : | |
| Construction Start | : | — |
| Target Completion | : | — |
| Project Ownership | : | Government |
| Project Works | : | New Construction |
| Value Range | : | Between 10 and 50 million |
| Project Value | : | |
| Contractor Spec | : | |
| Tender Deadline | : |
Full project details are on record for MIRI TRANSPORTATION OF WATER (FROM NIAH SUBIS WATER TREATMENT PLANT), covering the scope of works, site arrangement and contract structure. Available to myBina subscribers.
Recorded specifications for this project cover structural, M&E and finishes requirements, alongside contractor grade and tender details. Available to myBina subscribers.
myBina has identified 3 companies across 2 roles on MIRI TRANSPORTATION OF WATER (FROM NIAH SUBIS WATER TREATMENT PLANT): 2 developers and 1 contractor.
Contact us to reveal company names, phone numbers, emails and full contact details.
Other Water Supply construction projects recorded by myBina in Sarawak:
- MIRI TRANSPORTATION OF WATER (BEKENU & BAKONG)
- SARAWAK WATER SUPPLY GRID PROGRAM – STRESSED AREA (SEMATAN, LUNDU, SARAWAK – PHASE 2)
- SARAWAK WATER SUPPLY GRID PROGRAM – STRESSED AREA (TANJUNG MANIS, MUKAH DIVISION)
- SARAWAK WATER SUPPLY GRID PROGRAM – STRESSED AREA (SUBMARINE PIPE CROSSING SG LEPEH AND SG SEMUYANG)
- SARAWAK WATER SUPPLY GRID PROGRAM – STRESSED AREA (ND PIPE Rh. JANA, BATU MATOP)
Need access to all 10,000+ projects?
A myBina membership gives you unlimited access across all states, categories and project statuses — with alerts, CRM tools and export features.
Contact Us