Overview: SUNGAI SARAWAK INTEGRATED RIVER BASIN DEVELOPMENT PROJECT (PACKAGE 2) is a government Riverbank Erosion Control construction project in Sarawak. The scope is recorded as New Construction. SUNGAI SARAWAK INTEGRATED RIVER BASIN is currently recorded at Mobilization. The main contractor has been awarded. The project value is recorded in the Between 10 and 50 million range. myBina has identified 3 companies across 3 roles on SUNGAI SARAWAK INTEGRATED RIVER BASIN: 1 developer, 1 consultant and 1 contractor. This record was last verified on 26 June 2024 (Issue 202408.2).
| Project ID | : | 79192 |
| Issue Number | : | 202408.2 |
| Project Status | : | Mobilization |
| Job Award Status | : | Main contractor awarded |
| State | : | Sarawak |
| Category | : | Riverbank Erosion Control |
| Full Address | : | |
| Construction Start | : | — |
| Target Completion | : | — |
| Project Ownership | : | Government |
| Project Works | : | New Construction |
| Value Range | : | Between 10 and 50 million |
| Project Value | : | |
| Contractor Spec | : | |
| Tender Deadline | : |
Full project details are on record for SUNGAI SARAWAK INTEGRATED RIVER BASIN DEVELOPMENT PROJECT (PACKAGE 2), covering the scope of works, site arrangement and contract structure. Available to myBina subscribers.
Recorded specifications for this project cover structural, M&E and finishes requirements, alongside contractor grade and tender details. Available to myBina subscribers.
myBina has identified 3 companies across 3 roles on SUNGAI SARAWAK INTEGRATED RIVER BASIN DEVELOPMENT PROJECT (PACKAGE 2): 1 developer, 1 consultant and 1 contractor.
Contact us to reveal company names, phone numbers, emails and full contact details.
Other Riverbank Erosion Control construction projects recorded by myBina in Sarawak:
Need access to all 10,000+ projects?
A myBina membership gives you unlimited access across all states, categories and project statuses — with alerts, CRM tools and export features.
Contact Us