MAY 2026 · Malaysia

May 2026 Construction Digest

A total of 611 construction projects entered the myBina database in May 2026. That is 0.5% higher than April 2026, and 41.8% higher against May 2025. The estimated construction value of that intake is RM123.33 billion; 603 of the 611 records carry a value we can total.

611new projects
RM123.33 billionestimated value
+0.5%vs Apr 2026
+41.8%vs May 2025
302stage changes

The month in numbers

By value, the month climbed 111.2% higher month-on-month to RM123.33 billion, and stands 81.8% higher against May 2025. The average reported project is worth RM204.5 million, 112.6% higher on April 2026.

New projects reported — May 2025, Apr 2026 and May 20260153306458611Projects reported — May 2025: 431431May 2025Projects reported — Apr 2026: 608608Apr 2026Projects reported — May 2026: 611611May 2026Projects reportedEstimated construction valueRM0RM30.83 billionRM61.67 billionRM92.5 billionRM123.33 billionEstimated value — May 2025: RM67.84 billionRM67.84 billionMay 2025Estimated value — Apr 2026: RM58.4 billionRM58.4 billionApr 2026Estimated value — May 2026: RM123.33 billionRM123.33 billionMay 2026Estimated value
 May 2026 Apr 2026 May 2025 MoMYoY
Projects reported 611 608 431 +0.5% +41.8%
Estimated value RM123.33 billion RM58.4 billion RM67.84 billion +111.2% +81.8%
Records carrying a value 603 607 427

Where the work is: sector by sector

Sector by sector, Infrastructure led May 2026 with 102 new projects (16.7% of the month) worth an estimated RM19.52 billion. That is 15.7% lower than April 2026 and 47.8% higher than May 2025. Residential follows with 92 projects (RM2.78 billion, 12.4% lower month-on-month); Education follows with 71 projects (RM1.15 billion, 7.6% higher month-on-month). The sharpest move of the month came from Recreation, 300.0% higher on April 2026 at 4 projects.

Projects reported by sector, May 2026InfrastructureInfrastructureInfrastructure: 102102ResidentialResidentialResidential: 9292EducationEducationEducation: 7171UtilitiesUtilitiesUtilities: 6767Residential-up MarketResidential-up MarketResidential-up Market: 6262CommercialCommercialCommercial: 5858Hotel / Service ApartmentHotel / Service ApartmentHotel / Service Apartment: 4141Government BuildingsGovernment BuildingsGovernment Buildings: 3131
SectorMay 2026 Apr 2026MoM May 2025YoY Est. valueShare
Infrastructure 102 121 −15.7% 69 +47.8% RM19.52 billion 16.7%
Residential 92 105 −12.4% 71 +29.6% RM2.78 billion 15.1%
Education 71 66 +7.6% 28 +153.6% RM1.15 billion 11.6%
Utilities 67 62 +8.1% 46 +45.7% RM10.31 billion 11.0%
Residential-up Market 62 44 +40.9% 47 +31.9% RM7.53 billion 10.1%
Commercial 58 48 +20.8% 37 +56.8% RM2.34 billion 9.5%
Hotel / Service Apartment 41 36 +13.9% 21 +95.2% RM31.67 billion 6.7%
Government Buildings 31 36 −13.9% 34 −8.8% RM1.3 billion 5.1%
Medical 27 16 +68.8% 9 +200.0% RM2.39 billion 4.4%
Industrial 26 30 −13.3% 41 −36.6% RM13.28 billion 4.3%
Public Amenities 19 29 −34.5% 15 +26.7% RM104.1 million 3.1%
Mixed Development 6 11 −45.5% 11 −45.5% RM30.9 billion 1.0%
Others 5 3 +66.7% 0 n/a RM21.3 million 0.8%
Recreation 4 1 +300.0% 2 +100.0% RM27 million 0.7%

Projects on the move

myBina captured 302 recorded status changes on existing projects during May 2026, 15.2% lower than April 2026. The most common moves were: 57 moved from Tender / Evaluation to Construction - Site Works; 48 moved from Construction - Piling & Foundation Works to Construction - Structural; 28 moved from Construction - Site Works to Construction - Piling & Foundation Works. Only stage changes written into a fresh revision in the month are counted here, which makes this a conservative measure.

Recorded stage changes, May 2026Tender / Evaluation → Construction - Site WorksTender / Evaluation → Construction - Site Works: 5757Construction - Piling & Foundation Works → Construction - StructuralConstruction - Piling & Foundation Works → Construction - Structural: 4848Construction - Site Works → Construction - Piling & Foundation WorksConstruction - Site Works → Construction - Piling & Foundation Works: 2828Construction - Site Works → Construction - StructuralConstruction - Site Works → Construction - Structural: 2525Mobilization → Construction - Site WorksMobilization → Construction - Site Works: 2020Construction - Structural → Internal WorksConstruction - Structural → Internal Works: 1717Document - Approval & Lobbying → Construction - Site WorksDocument - Approval & Lobbying → Construction - Site Works: 1212

The month's largest reported projects

The 6 highest-value projects entering our database in May 2026. Values are our reported estimate. Residential records classified as private bungalow or private housing are not listed.

State by state

On the map, 124 projects (20.3%) landed in Selangor, an estimated RM8.26 billion, and 2.5% higher than April 2026. Next came Sarawak (91) and Johor (66).

Projects reported by state, May 2026SelangorSelangorSelangor: 124124SarawakSarawakSarawak: 9191JohorJohorJohor: 6666PerakPerakPerak: 6464Pulau PinangPulau PinangPulau Pinang: 5454W.P. Kuala LumpurW.P. Kuala LumpurW.P. Kuala Lumpur: 4545KedahKedahKedah: 3737PahangPahangPahang: 3535SabahSabahSabah: 2525TerengganuTerengganuTerengganu: 1818
StateProjectsApr 2026 MoMEst. value
Selangor 124 121 +2.5% RM8.26 billion
Sarawak 91 68 +33.8% RM9.72 billion
Johor 66 70 −5.7% RM47.36 billion
Perak 64 61 +4.9% RM4.91 billion
Pulau Pinang 54 51 +5.9% RM4.24 billion
W.P. Kuala Lumpur 45 44 +2.3% RM34.5 billion
Kedah 37 51 −27.5% RM1.07 billion
Pahang 35 33 +6.1% RM1.77 billion
Sabah 25 34 −26.5% RM7.94 billion
Terengganu 18 14 +28.6% RM994.5 million
Melaka 15 8 +87.5% RM285.9 million
Kelantan 14 19 −26.3% RM1.49 billion
Negeri Sembilan 13 16 −18.8% RM561.9 million
W.P. Putrajaya 6 8 −25.0% RM139.8 million
Perlis 2 4 −50.0% RM41.4 million
W.P. Labuan 2 6 −66.7% RM42.8 million

How big were they

The size mix shows 26 projects above RM500 million, 4.3% of intake and 18.2% higher month-on-month, against 227 below RM10 million.

Project size mix, May 2026Under RM10 million: 227 (37.2%)37%RM10–100 million: 253 (41.4%)41%RM100–500 million: 97 (15.9%)16%RM500 million – RM1 billion: 13 (2.1%)Above RM1 billion: 13 (2.1%)Value not disclosed: 8 (1.3%)Under RM10 million — 227 (37.2%)RM10–100 million — 253 (41.4%)RM100–500 million — 97 (15.9%)RM500 million – RM1 billion — 13 (2.1%)Above RM1 billion — 13 (2.1%)Value not disclosed — 8 (1.3%)

Tendering and awards

On procurement, the month’s projects break down as Main contractor awarded (435), Subcontractor awarded (130), Subcontractor tender (45). A project may carry more than one award status, so these do not sum to the month total.

Projects by award status, May 2026Main contractor awardedMain contractor awardedMain contractor awarded: 435435Subcontractor awardedSubcontractor awardedSubcontractor awarded: 130130Subcontractor tenderSubcontractor tenderSubcontractor tender: 4545

What it adds up to

With month-on-month and year-on-year both positive, May 2026 marks a genuine step up in reported pipeline rather than a single strong week.

Citing this page
Free to quote with attribution to myBina. Suggested form: myBina May 2026 Malaysian Construction Digest — https://www.mybina.com.my/digest.php?m=2026-05

For the underlying project records, or a figure not shown here, contact us.

How these numbers are built

What a "new project" is. A project counted in May 2026 is one myBina first reported that month. That is a reporting date, not a groundbreaking date — a job may have been planned or tendered earlier. This is a measure of what entered the record in the month.

Value is an estimate. Many records state a value band rather than a figure, so the midpoint of the band is used. 603 of 611 records this month (98.7%) carry a value we can total; the rest contribute nothing, so the total is a floor rather than a market size.

One sector per project. Sector shares use each project's main category, so they add to 100%. Award status is the exception: a project can carry more than one, and that table is counted per status.

Stage changes are recorded, not inferred from site activity. A change is counted when a project's new revision carries a different stage from its previous one. Changes corrected within an existing revision are not visible to this count, which makes it a minimum.

Scope. Verified, live project records only. Cancelled records are excluded, and residential records classified as private bungalow or private housing are excluded from the named projects.

Frozen on publication. These figures were computed on 23 September 2026 and are not recalculated, so a figure cited from this page stays as cited.

The projects behind these numbers

myBina members see every project in this digest by name, with value, stage, specification and the companies attached to each job.

See what a subscription includes

Earlier editions

myBina Construction Digest · May 2026 · mybina.com.my · figures computed 23 September 2026. Values are estimates from reported value bands; counts are projects first reported in the month.