AUGUST 2026 · Malaysia

August 2026 Construction Digest

myBina recorded 1,068 new construction projects across Malaysia in August 2026, 14.3% lower than July 2026 and 65.3% higher than August 2025. Their combined estimated value is RM304.26 billion, drawn from the 1,064 of 1,068 records that carry a disclosed or banded value.

1,068new projects
RM304.26 billionestimated value
−14.3%vs Jul 2026
+65.3%vs Aug 2025
327stage changes

The month in numbers

By value, the month was up 15.2% higher month-on-month to RM304.26 billion, and stands 118.1% higher against August 2025. The average reported project is worth RM286 million, 34.6% higher on July 2026.

New projects reported — Aug 2025, Jul 2026 and Aug 202603126239351,246Projects reported — Aug 2025: 646646Aug 2025Projects reported — Jul 2026: 1,2461,246Jul 2026Projects reported — Aug 2026: 1,0681,068Aug 2026Projects reportedEstimated construction valueRM0RM76.07 billionRM152.13 billionRM228.2 billionRM304.26 billionEstimated value — Aug 2025: RM139.53 billionRM139.53 billionAug 2025Estimated value — Jul 2026: RM264.14 billionRM264.14 billionJul 2026Estimated value — Aug 2026: RM304.26 billionRM304.26 billionAug 2026Estimated value
 Aug 2026 Jul 2026 Aug 2025 MoMYoY
Projects reported 1,068 1,246 646 −14.3% +65.3%
Estimated value RM304.26 billion RM264.14 billion RM139.53 billion +15.2% +118.1%
Records carrying a value 1,064 1,243 642

Where the work is: sector by sector

Residential accounted for the largest share of August 2026 intake: 232 projects, 21.7% of everything reported, at an estimated RM8.87 billion. Against July 2026 it is 7.4% higher; against August 2025, 58.9% higher. Infrastructure follows with 140 projects (RM130.24 billion, 27.1% lower month-on-month); Industrial follows with 133 projects (RM89.51 billion, 1.5% lower month-on-month). Watch Others: 8 projects, 700.0% higher month-on-month, the widest move in the table.

Projects reported by sector, Aug 2026ResidentialResidentialResidential: 232232InfrastructureInfrastructureInfrastructure: 140140IndustrialIndustrialIndustrial: 133133CommercialCommercialCommercial: 102102Residential-up MarketResidential-up MarketResidential-up Market: 101101EducationEducationEducation: 9898UtilitiesUtilitiesUtilities: 8484Hotel / Service ApartmentHotel / Service ApartmentHotel / Service Apartment: 6666
SectorAug 2026 Jul 2026MoM Aug 2025YoY Est. valueShare
Residential 232 216 +7.4% 146 +58.9% RM8.87 billion 21.7%
Infrastructure 140 192 −27.1% 79 +77.2% RM130.24 billion 13.1%
Industrial 133 135 −1.5% 63 +111.1% RM89.51 billion 12.5%
Commercial 102 104 −1.9% 71 +43.7% RM15.77 billion 9.6%
Residential-up Market 101 112 −9.8% 76 +32.9% RM13.06 billion 9.5%
Education 98 150 −34.7% 45 +117.8% RM1.77 billion 9.2%
Utilities 84 119 −29.4% 54 +55.6% RM3.05 billion 7.9%
Hotel / Service Apartment 66 58 +13.8% 26 +153.8% RM21.13 billion 6.2%
Government Buildings 47 73 −35.6% 28 +67.9% RM1.46 billion 4.4%
Medical 19 37 −48.6% 20 −5.0% RM2.55 billion 1.8%
Public Amenities 16 31 −48.4% 21 −23.8% RM103.5 million 1.5%
Mixed Development 15 12 +25.0% 11 +36.4% RM16.68 billion 1.4%
Others 8 1 +700.0% 2 +300.0% RM18.9 million 0.7%
Recreation 7 6 +16.7% 3 +133.3% RM38.1 million 0.7%

Projects on the move

August 2026 carried 327 recorded stage changes across projects already on file, 37.0% lower against July 2026. Leading the movement: 54 moved from Tender / Evaluation to Construction - Site Works; 43 moved from Construction - Piling & Foundation Works to Construction - Structural; 33 moved from Construction - Site Works to Construction - Structural. These counts reflect stage changes captured in a new project revision during the month and are a floor, not a census.

Recorded stage changes, Aug 2026Tender / Evaluation → Construction - Site WorksTender / Evaluation → Construction - Site Works: 5454Construction - Piling & Foundation Works → Construction - StructuralConstruction - Piling & Foundation Works → Construction - Structural: 4343Construction - Site Works → Construction - StructuralConstruction - Site Works → Construction - Structural: 3333Construction - Site Works → Construction - Piling & Foundation WorksConstruction - Site Works → Construction - Piling & Foundation Works: 2626Tender / Evaluation → MobilizationTender / Evaluation → Mobilization: 2525Mobilization → Construction - Site WorksMobilization → Construction - Site Works: 1717Construction - Structural → Internal WorksConstruction - Structural → Internal Works: 1212

The month's largest reported projects

The 6 highest-value projects entering our database in August 2026. Values are our reported estimate. Residential records classified as private bungalow or private housing are not listed.

State by state

On the map, 236 projects (22.1%) landed in Selangor, an estimated RM70.58 billion, and 14.8% lower than July 2026. Next came Perak (154) and Pulau Pinang (135).

Projects reported by state, Aug 2026SelangorSelangorSelangor: 236236PerakPerakPerak: 154154Pulau PinangPulau PinangPulau Pinang: 135135JohorJohorJohor: 106106KedahKedahKedah: 7777SabahSabahSabah: 7070W.P. Kuala LumpurW.P. Kuala LumpurW.P. Kuala Lumpur: 6565SarawakSarawakSarawak: 5757PahangPahangPahang: 4343Negeri SembilanNegeri SembilanNegeri Sembilan: 2828
StateProjectsJul 2026 MoMEst. value
Selangor 236 277 −14.8% RM70.58 billion
Perak 154 112 +37.5% RM35.76 billion
Pulau Pinang 135 169 −20.1% RM38.96 billion
Johor 106 103 +2.9% RM33.94 billion
Kedah 77 79 −2.5% RM2.35 billion
Sabah 70 114 −38.6% RM14.95 billion
W.P. Kuala Lumpur 65 72 −9.7% RM19.12 billion
Sarawak 57 121 −52.9% RM2.99 billion
Pahang 43 34 +26.5% RM1.49 billion
Negeri Sembilan 28 52 −46.2% RM29.79 billion
Kelantan 28 18 +55.6% RM50.9 billion
Terengganu 20 36 −44.4% RM1.08 billion
Melaka 17 34 −50.0% RM1.51 billion
W.P. Putrajaya 15 8 +87.5% RM275.2 million
Perlis 11 12 −8.3% RM190 million
W.P. Labuan 4 1 +300.0% RM126 million

How big were they

The size mix shows 60 projects above RM500 million, 5.6% of intake and 21.1% lower month-on-month, against 317 below RM10 million.

Project size mix, Aug 2026Under RM10 million: 317 (29.7%)30%RM10–100 million: 501 (46.9%)47%RM100–500 million: 186 (17.4%)17%RM500 million – RM1 billion: 27 (2.5%)Above RM1 billion: 33 (3.1%)Value not disclosed: 4 (0.4%)Under RM10 million — 317 (29.7%)RM10–100 million — 501 (46.9%)RM100–500 million — 186 (17.4%)RM500 million – RM1 billion — 27 (2.5%)Above RM1 billion — 33 (3.1%)Value not disclosed — 4 (0.4%)

Tendering and awards

On procurement, the month’s projects break down as Main contractor awarded (773), Subcontractor awarded (292), Subcontractor tender (91). A project may carry more than one award status, so these do not sum to the month total.

Projects by award status, Aug 2026Main contractor awardedMain contractor awardedMain contractor awarded: 773773Subcontractor awardedSubcontractor awardedSubcontractor awarded: 292292Subcontractor tenderSubcontractor tenderSubcontractor tender: 9191

What it adds up to

Against August 2025 the month is clearly ahead, even where the month-on-month figure is softer — a reminder that a single month is a noisier series than a year.

Citing this page
Free to quote with attribution to myBina. Suggested form: myBina August 2026 Malaysian Construction Digest — https://www.mybina.com.my/digest.php?m=2026-08

For the underlying project records, or a figure not shown here, contact us.

How these numbers are built

What a "new project" is. A project counted in August 2026 is one myBina first reported that month. That is a reporting date, not a groundbreaking date — a job may have been planned or tendered earlier. This is a measure of what entered the record in the month.

Value is an estimate. Many records state a value band rather than a figure, so the midpoint of the band is used. 1,064 of 1,068 records this month (99.6%) carry a value we can total; the rest contribute nothing, so the total is a floor rather than a market size.

One sector per project. Sector shares use each project's main category, so they add to 100%. Award status is the exception: a project can carry more than one, and that table is counted per status.

Stage changes are recorded, not inferred from site activity. A change is counted when a project's new revision carries a different stage from its previous one. Changes corrected within an existing revision are not visible to this count, which makes it a minimum.

Scope. Verified, live project records only. Cancelled records are excluded, and residential records classified as private bungalow or private housing are excluded from the named projects.

Frozen on publication. These figures were computed on 22 September 2026 and are not recalculated, so a figure cited from this page stays as cited.

The projects behind these numbers

myBina members see every project in this digest by name, with value, stage, specification and the companies attached to each job.

See what a subscription includes

Earlier editions

myBina Construction Digest · August 2026 · mybina.com.my · figures computed 22 September 2026. Values are estimates from reported value bands; counts are projects first reported in the month.