June 2026 closed with 668 newly reported construction projects on myBina, running 9.3% higher than the previous month and 59.4% higher than a year earlier. The estimated construction value of that intake is RM113.41 billion; 665 of the 668 records carry a value we can total.
668new projects
RM113.41 billionestimated value
+9.3%vs May 2026
+59.4%vs Jun 2025
296stage changes
The month in numbers
Estimated value eased to RM113.41 billion, 8.0% lower on May 2026 and 79.3% lower on the same month last year. Mean project size works out at RM170.5 million, 16.6% lower month-on-month.
Jun 2026
May 2026
Jun 2025
MoM
YoY
Projects reported
668
611
419
+9.3%
+59.4%
Estimated value
RM113.41 billion
RM123.33 billion
RM549.16 billion
−8.0%
−79.3%
Records carrying a value
665
603
417
—
Where the work is: sector by sector
Residential accounted for the largest share of June 2026 intake: 131 projects, 19.6% of everything reported, at an estimated RM3.7 billion. The sector climbed 42.4% higher month-on-month, and sits 87.1% higher year-on-year. Infrastructure follows with 97 projects (RM7.51 billion, 4.9% lower month-on-month); Education follows with 86 projects (RM1.23 billion, 21.1% higher month-on-month). The sharpest move of the month came from Industrial, 53.8% higher on May 2026 at 40 projects.
Sector
Jun 2026
May 2026
MoM
Jun 2025
YoY
Est. value
Share
Residential
131
92
+42.4%
70
+87.1%
RM3.7 billion
19.6%
Infrastructure
97
102
−4.9%
78
+24.4%
RM7.51 billion
14.5%
Education
86
71
+21.1%
36
+138.9%
RM1.23 billion
12.9%
Utilities
76
67
+13.4%
62
+22.6%
RM26.02 billion
11.4%
Commercial
58
58
0.0%
46
+26.1%
RM15.52 billion
8.7%
Residential-up Market
57
62
−8.1%
40
+42.5%
RM6.42 billion
8.5%
Industrial
40
26
+53.8%
35
+14.3%
RM25.5 billion
6.0%
Hotel / Service Apartment
35
41
−14.6%
15
+133.3%
RM22.43 billion
5.2%
Government Buildings
34
31
+9.7%
14
+142.9%
RM495.3 million
5.1%
Public Amenities
20
19
+5.3%
10
+100.0%
RM111.3 million
3.0%
Medical
14
27
−48.1%
5
+180.0%
RM1.93 billion
2.1%
Mixed Development
9
6
+50.0%
4
+125.0%
RM2.43 billion
1.3%
Others
6
5
+20.0%
1
+500.0%
RM95 million
0.9%
Recreation
5
4
+25.0%
3
+66.7%
RM25.1 million
0.7%
Projects on the move
Existing projects moved stage 296 times in June 2026 as recorded by our editors, 2.0% lower than the month before. Leading the movement: 67 moved from Tender / Evaluation to Construction - Site Works; 52 moved from Construction - Piling & Foundation Works to Construction - Structural; 30 moved from Construction - Site Works to Construction - Structural. The figure counts changes recorded against a new revision within the month, so it should be read as a minimum.
The month's largest reported projects
The 6 highest-value projects entering our database in June 2026.
Values are our reported estimate. Residential records classified as private bungalow or private housing are not listed.
Geographically, Selangor took 148 of the month’s projects (22.2%), worth an estimated RM17.9 billion, 19.4% higher than May 2026. Perak (77) and Sarawak (65) followed.
State
Projects
May 2026
MoM
Est. value
Selangor
148
124
+19.4%
RM17.9 billion
Perak
77
64
+20.3%
RM6.48 billion
Sarawak
65
91
−28.6%
RM17.64 billion
Johor
60
66
−9.1%
RM9.18 billion
W.P. Kuala Lumpur
58
45
+28.9%
RM8.39 billion
Kedah
55
37
+48.6%
RM16.08 billion
Pulau Pinang
39
54
−27.8%
RM2.87 billion
Sabah
38
25
+52.0%
RM2.42 billion
Pahang
27
35
−22.9%
RM592.8 million
Melaka
22
15
+46.7%
RM27.38 billion
Negeri Sembilan
20
13
+53.8%
RM457.9 million
Kelantan
16
14
+14.3%
RM1.29 billion
W.P. Putrajaya
16
6
+166.7%
RM1.18 billion
Terengganu
13
18
−27.8%
RM1.08 billion
Perlis
9
2
+350.0%
RM253.9 million
W.P. Labuan
3
2
+50.0%
RM23.8 million
How big were they
5.2% of June 2026’s projects (35 of them) carry a value above RM500 million, 34.6% higher than May 2026; 263 fall under RM10 million.
Tendering and awards
On procurement, the month’s projects break down as Main contractor awarded (456), Subcontractor awarded (152), Subcontractor tender (43). A project may carry more than one award status, so these do not sum to the month total.
What it adds up to
Read together, June 2026 is running ahead of both the previous month and the same point a year ago, which places reported activity on a firmer footing than at any point this quarter.
Citing this page
Free to quote with attribution to myBina. Suggested form:
myBina June 2026 Malaysian Construction Digest — https://www.mybina.com.my/digest.php?m=2026-06
For the underlying project records, or a figure not shown here, contact us.
How these numbers are built
What a "new project" is. A project counted in June 2026 is one myBina first
reported that month. That is a reporting date, not a groundbreaking date — a job may have been planned or
tendered earlier. This is a measure of what entered the record in the month.
Value is an estimate. Many records state a value band rather than a figure, so the midpoint of the
band is used. 665 of 668 records this month
(99.6%) carry a value we can
total; the rest contribute nothing, so the total is a floor rather than a market size.
One sector per project. Sector shares use each project's main category, so they add to 100%.
Award status is the exception: a project can carry more than one, and that table is counted per status.
Stage changes are recorded, not inferred from site activity. A change is counted when a project's
new revision carries a different stage from its previous one. Changes corrected within an existing revision
are not visible to this count, which makes it a minimum.
Scope. Verified, live project records only. Cancelled records are excluded, and residential records
classified as private bungalow or private housing are excluded from the named projects.
Frozen on publication. These figures were computed on
23 September 2026 and are not recalculated, so a figure cited from this page stays as cited.
The projects behind these numbers
myBina members see every project in this digest by name, with value, stage, specification
and the companies attached to each job.
myBina Construction Digest · June 2026 · mybina.com.my
· figures computed 23 September 2026.
Values are estimates from reported value bands; counts are projects first reported in the month.